Uganda and Tanzania have agreed to accelerate the implementation of the East African Crude Oil Pipeline (EACOP) and the standard gauge railway (SGR) following bilateral talks between their leaders.
The agreement was reached after President Yoweri Museveni held talks with the visiting Tanzanian President, Samia Suluhu Hassan at State House, Entebbe, Uganda on Wednesday.
The two leaders welcomed progress on the East African Crude Oil Pipeline, which is 93.9 per cent complete, and called for the remaining construction, testing, commissioning and operational readiness activities to be expedited.
They described EACOP as a flagship regional infrastructure project expected to strengthen energy security, attract investment, create jobs and accelerate socioeconomic development in Uganda, Tanzania and the wider East African region.
Beyond crude oil transportation, Museveni urged the two countries to pursue joint investments across the petroleum industry, warning that fragmented national approaches could result in duplicated infrastructure, higher costs and missed economic opportunities.
He cited Uganda’s plans to establish a refinery in Hoima alongside its support for a larger refinery in Tanzania’s Tanga, arguing that regional coordination would allow the countries to pool resources and develop strategically located facilities.
Museveni described failure to pursue such arrangements as a “crippling mistake”, saying cooperation should extend to refining, storage, distribution and other aspects of the petroleum value chain.
The two Presidents consequently called for an integrated regional energy industry anchored in value addition, industrialization and joint investment.
They directed relevant authorities to expedite implementation of the August 2026 Memorandum of Understanding to develop Tanga into a Regional Energy Hub. The proposed facility will support petroleum storage, refining, trading, distribution and logistics, as well as investments in fertilisers, plastics, industrial chemicals and other petroleum-based products.
They also called for faster development of natural gas and refined petroleum products pipelines, alongside the 400kV electricity interconnector linking Wobulenzi, Masaka, Ibadakuli and Shinyanga.
On railway infrastructure, the two Presidents welcomed the signing of a Framework Agreement for the Isaka-Lusahunga-Murongo/Kikagati-Mpondwe Standard Gauge Railway project.
They directed the responsible ministries, railway authorities and other institutions to expedite feasibility studies, technical designs, financing arrangements and other outstanding preparatory work.
The railway is expected to improve cross-border connectivity, facilitate trade, reduce transportation and logistics costs and strengthen regional integration.
MG/abj/APA



